With the new flat racing season fast approaching, the local team from MJ Abbott got to work replacing the borehole pump and controls at Salisbury Racecourse to secure the water supply for the irrigation system.
The borehole pump is as far in the ground as the Salisbury Cathedral spire is high, suspended on 4″ threaded galvanised steel tube. This 46m³ per hour Grundfos pump definitely raises the heart rate and shreds the shoulders. Top effort from our local team.
Related news
09 April 2024
‘The Race is On’ for water at Salisbury Racecourse!
With the new flat racing season fast approaching, the local team from MJ Abbott got to work …
19 January 2024
MJ Abbott director Adrian Riggs visits Grundfos Pumps factory in Denmark
MJ Abbott’s director Adrian Riggs was recently invited by Grundfos Pumps to visit …
01 March 2023
MJ Abbott presents Funke HS pipe system to Wessex Water engineers
Engineers from Wessex Water recently attended a presentation at MJ Abbott demonstrating …