With the new flat racing season fast approaching, the local team from MJ Abbott got to work replacing the borehole pump and controls at Salisbury Racecourse to secure the water supply for the irrigation system.
The borehole pump is as far in the ground as the Salisbury Cathedral spire is high, suspended on 4″ threaded galvanised steel tube. This 46m³ per hour Grundfos pump definitely raises the heart rate and shreds the shoulders. Top effort from our local team.
Related news
18 March 2026
MJ Abbott awarded partial accreditation under Water Industry Registration Scheme (WIRS)
MJ Abbott Ltd has been awarded partial accreditation under the Water Industry Registration Scheme (WIRS) by …
21 January 2026
MJ Abbott continues to invest in specialist equipment
MJ Abbott continues to invest in specialist equipment to strengthen our Water
Engineering Services, with …
12 May 2025
Reservoir replacement near Old Sarum Castle
Following a concerned call from our client who believed they had a major water leak, MJ Abbott responded promptly …