Delivering quality since 1965
Please call us
01722 716361
Search Site
Friday 1 December 2023
Search
only in current section
Advanced Search…
Home
About us
CORONAVIRUS - LATEST
Company profile
Meet the team
Facilities & resources
Plant & machinery
Company history
Services
Golf construction
Sports turf
Irrigation
Water management
Drainage
Landscaping
Water engineering
Sewage engineering
Civil engineering
Specialist services
Sales office & counter
Projects
News
Shop
About our shop
Visit our shop
Resources
Company brochure
Product guide
Video galleries
Media information
Links
Work for us
Electrical Pump Engineer
Ground Workers
Water Engineers
Tractor/Trencher Operators
Golf & Sports Finishers
Trainee Irrigation Engineers
Marketing Assistant
Trainee Contracts Supervisor
Irrigation Service Engineer
Welder / Fabricator
Contact
Home
Skip to content.
|
Skip to navigation
Info
Site map
An overview of the available content on this site. Keep the pointer still over an item for a few seconds to get its description.
About us
CORONAVIRUS - LATEST
Company profile
Meet the team
Facilities & resources
Plant & machinery
CAT D6N bulldozer
CAT D6N bulldozer with laser grading attachment
Hitachi 210LC excavator - 21 tonnes
Hitachi 210LC excavator - 21 tonnes
Hitachi 130LCN excavator with Engcon attachment
JCB 714 articulated dumper
Thwaites dumper - 9 tonne
Thwaites dumper - 9 tonne
Takeuchi TB228 tracked excavator - 2.5 tonne
Takeuchi TB016 mini excavator - 1.5 tonne
Kongskilde Stonebear stonepicker
Harley 740 XI stone screener
Blecavator SB230 stoneburier
Blecavator stoneburier
Vaderstad RX450 grading roller
Raycam 240 Speed-dresser
John Deere bunker rake
Blec hydroseeder
Mastenbroek 15-15 chain trencher
Mastenbroek 15-15 drainage trencher
Dynapac 1800 chain trencher
Dynapac 1800 chain trencher
Rock wheel trencher
Rock wheel trencher
Wheel trencher
Small laser guided chain trencher
Sand slitting wheel
Blec Groundbreaker with Sandmaster
Blec Groundbreaker with Sandmaster
Gravel cart - 6 tonne
Ditch Witch HT115 with vibratory plough
Case 960 mole plough
Case 860 mole plough
Case 660 mole plough
Case 560 mole plough
Case 560 mole plough
Case RT560 mole plough
Winch drawn non-tension mole plough
Wheel trencher
Wheel trencher
Ditch Witch rock wheel
Ditch Witch Zahn trencher
Ditch Witch Zahn trencher
Takeuchi TB125 fitted with backfilling blade
Dynapac vibrating roller
John Deere 3245C 5 unit rotary mower
John Deere 1565 rotary mower
Wessex GR1800 flail collector
Topper
Koro Field Top Maker
Dakota 440 turf tender
CAT D6N bulldozer with laser grading attachment
Blec laser grader
Hitachi ZX180LC excavator with Engcon attachment
CAT D6N bulldozer with 3D total station attachment
Hitachi ZX130LCN-5B excavators with Engcon
Hitachi ZX130LCN-5B excavator - 13 tonnes
Takeuchi TB285 excavators with Engcon attachments
Thwaites dumper - 5 tonne swivel skip
Blec BV230HD Vibra-Screen
JCB JS130LC excavator - 13 tonnes
JCB JS130LC excavator with Engcon attachment
Easy Lawn hydroseeder
Proforge MonoMole mounted beam mole plough
Takeuchi TB228 mini excavator - 2.5 tonne
CAT 432E backhoe loader
Thwaites dumper - 6 tonnes
Blec DD36 Cultipack seeder
GKB Drainmaster
Company history
Services
Golf construction
Sports turf
Irrigation
Water management
Drainage
Landscaping
Water engineering
Sewage engineering
Civil engineering
Specialist services
Sales office & counter
Projects
Celtic Manor Resort, South Wales
The Twenty Ten Course during the Wales Open
View across the Twenty Ten Course
Construction of 18th Hole
Construction of the 18th Green
Fairway construction
Trenching with rock wheel
Fairway drainage installation
Fairway drainage with sand topping prior to topsoil respread
Dozer spreading topsoil between fairway drainage lines
Preparing greens surface for turfing
Turfing green
Seeding green surrounds
Completed hole
Completed 16th Hole, viewed from tees
Completed water feature at the 18th Green
Arun District Council, West Sussex
Shaping feature mounding alongside new public footpath
Constructing pitch
Laser guided dozer re-spreading topsoil
Seeding pitch
Ferndown Golf Club, Dorset
Turf stripped from proposed drainage lines
Drainage trench
Trenching with laser guided mini chain trencher, spoil conveyed into trailer
Installation of mainlines pipework
Backfilling trench with gravel
Backfilling top of trench with rootzone
Finished green with reinstated turf
Folkestone RFC, Kent
Grade rolling to existing pitch surface
Construction of new pitch
Topsoil re-spread to new pitch
Installation of forced sand slits over primary drainage
Hylands School, Essex
Construction of drainage swales
Cut and fill earthworks
Grading pitch ready for seeding
Drainage swales following first grass cut
First grass cut during establishment
Llandarcy Academy of Sport, South Wales
Sand spreading before amelioration into topsoil
Cut and fill earthworks carried out with dozer and box
Screening topsoil
Primary drainage installation - laterals at 6 metre centres
Secondary drainage - forced sand slitting at 750mm centres
Seeded plateau
Hose reel irrigation in operation
Melksham Oak Community School, Wiltshire
Earthworks
Primary drainage installation
Artificial hockey pitch
Artificial surface
MUGA
Aerial view of artifical sports facilities
Merchants' Academy, Bristol
Artificial football pitch
Earthworks
Topsoil re-spread
Seeded plateau
High jump during construction
Netball on MUGA
Tennis on MUGA
Plymouth Argyle Football Club
Removing old pitch surface
Seeded pitch
Ffos Las Racecourse, South Wales
Aerial view of racecourse
Primary drainage installation
Primary drainage installation - gravel carts
Rock wheel trenching for pipe installation
Rock wheel conveying spoil into dumper
Secondary drainage: sand slits prior to topping up
Track on race day
First race
Scarlets Rugby, South Wales
Liam Williams scores a try at Parc y Scarlets
Grading sub-base
Pitch drainage layout
Gravel installed over geotextile between drains
Gravel carpet installation
Seed just germinating
Pitch establishing
Scarlets v Leicester at Parc y Scarlets
Scoring a try at Parc y Scarlets
Hackney Marshes, East London
Hackney Marshes from the air
Hackney Marshes
Letchworth Garden City RUFC, Hertfordshire
Letchworth Garden City RUFC in action
Marchwood Power, Hampshire
Installation of deep drainage
Primary drainage installation
Ditch construction
North Lincolnshire Council, Scunthorpe
Completed bowling green
Construction of bowling green
Turfing works
Reconstructed bowling green surface
Northop Golf & Country Club, Chester
Cleaning trench lines with mechanical sweeper
Wheel trencher installing primary land drainage
Wheel trencher, gravel cart and dumper
Laser controlled primary drainage installation
Sunningdale Golf Club, Berkshire
Primary drainage installed at 8 metres centres
Primary drainage installation
Primary drainage installed on 14th Fairway
Drainage machinery operating on turf protection boards
Turf protection boards
Completed drain on 2nd Fairway
Torquay Golf Club, Devon
Mastenbroek laser guided chain trencher installing primary drainage
Laser guided trenching
Primary drainage installation
St John's School, Northwood
Cut and fill earthworks
Primary drainage installation
Primary drainage installation - topping up rootzone
View of completed pitches
St John's School, Northwood
View from top of hill
View from bottom of hill
St Mary's High School, Hertfordshire
Aerial view during construction of facilities
Laser grading embankments
Screening topsoil
Primary drainage installation
Forced sand slitting
View of pitches during construction
Topsoil re-spread
Topsoil re-spread and grading
Cricket square construction
Cricket square and outfield prepared ready for seeding
Netball on MUGA
Close House Hotel & Golf, Newcastle
Lee Westwood tees off on The Colt Course at Close House
Topsoil strip
Cut & fill earthworks
Bulk earthworks
Trenching with rock wheel
Loading topsoil for respread from weathered heaps
Topsoil respread
Topsoil preparation
Path construction
Installation of irrigation suction pipe
Greens preparation
Greens seeding
Close House Hotel
The Colt Course at Close House
The Clubhouse at Close House
Rockliffe Hall Hotel & Golf Resort, Darlington
Rockliffe Hall, view of 4th Hole
Construction of wetland
Lake construction
Installation of deep carrier drainage
Primary drainage installation
Green bunker complex shaping
Lake during establishment
Lake edge detail
Fairways during maintenance
Course view
Stevenage Football Club, Hertfordshire
Koro Top Maker used to strip vegetation from topsoil
Constructing junior pitch
Rotovating topsoil prior to re-levelling
Seeded pitch areas
Established junior pitch
Established pitch areas
Cambridge American Cemetery
Cambridge American Cemetery
Installation of mainline pipework
Trenching between headstones
Reinstated irrigation trench
High trajectory sprinkler operating between headstones
Sprinker operating at the Chapel
Landscape irrigation
Cemetery Mall irrigation
Irrigation to flagstaff area
Pump station installed within the Chapel cellar
Ascot Racecourse, Berkshire
Rain Bird sprinklers operating in front of the grandstand
Trenching on the Flat Course
Installation along the Straight Mile
Installation of 90mm lateral pipework within re-aligned track formation
Refurbishment of the Round Pond filter chamber
Trenching in pipework with turf reinstatement
Trench reinstatement prior to rolling
Broadstone Golf Club, Dorset
Moleploughing mainline pipework
Moleploughing putting green pipework
Moleploughing greens lateral pipework
Backfilling sprinkler
Sprinkler installation
Levelling sprinkler
Reinstating ground levels
Replacing turf
Completed sprinkler installation
Stockley Academy, West London
Plateau during maintenance period
Loading screened topsoil for re-spread
Dozer receiving topsoil for re-spread
Laser guided dozer spreading topsoil
The Crown Estate, Windsor
Trenching mains pipework within the Heather Gardens
Hydrant just installed
Moleploughing mains pipework within the Heather Gardens
Ealing Golf Club, West London
Ealing Golf Club
Ffos Las Racecourse, South Wales
Racecourse with irrigation lakes in foreground
Briggs irrigator operating on track
Briggs irrigator boom
Wolverhampton Wanderers Football Club
Cut and fill earthworks
Spreading gravel drainage layer
Installing pitch perimeter kerbs
Installing pitch undersoil heating system
Seeded pitch
Irrigating seeded area
Sprinkler operating
Irrigating newly seeded pitch
First grass cut
First grass cut
Construction of dug-outs
Laying tarmac to perimeter areas
Pitch on match day
Warm up on match day
Garon Park Golf Complex, Southend-on-Sea, Essex
Moleploughing lateral pipework around the Putting Green
Moleploughing pipework
Gullane Golf Club, Scotland
Underground concrete water storage tank
Putting green installation
Installation of putting green lateral pipework
Completed putting green installation
Installation of roof to water storage tank
Hampshire Cricket, The Rose Bowl, Southampton
The Rose Bowl
High Post Golf Club, Wiltshire
High Post Golf Club - 9th Hole
High Post Golf Club - 14th Hole
La Moye Golf Club, Jersey
Reservoir construction earthworks
Lining reservoir
Completed reservoir
Service trench installed through golf course
Reinstated service trench
Pumphouse
Pump station
Installation of mainlines pipework
Moleploughing mainlines pipework
Moleploughing lateral pipework
Installation of valve assembly
Engineer installing fairway sprinkler
Rolling moled pipework route
Engineer testing sprinkler
Malone Golf Club, Belfast, Northern Ireland
Malone Golf Club
Moleploughing lateral pipework on 2nd Tees
Installation of greens isolation valve assembly
Tee solenoid valve assembly just installed
Minchinhampton Golf Club, Gloucestershire
Minchinhampton Golf Club
HCEG Muirfield, Scotland
Sprinklers operating on the 18th Green
Rain Bird 950E sprinklers
Water storage tank and pumphouse
North Hants Golf Club, Fleet, Hampshire
North Hants Golf Club
Moleploughing fairway lateral pipework
90mm diameter mainline pipework installation
Valve assembly just installed
Aerial view of North Hants Golf Club
Poult Wood Golf Centre, Tonbridge, Kent
Irrigation water storage tank and pumphouse
Mainlines installation
Installation of putting green pipework
Moleploughing pipework around the putting green
Sprinklers operating on the putting green
Sprinklers operating on a tee
Prestwick Golf Club, Ayrshire, Scotland
Prestwick Golf Club
Sprinklers operating in front of clubhouse
The Renaissance Club, East Lothian, Scotland
The Renaissance Club, East Lothian
The Renaissance Club
The Renaissance Club, Scotland
Royal Liverpool Golf Club, Hoylake
Installing valve assemblies
Moleploughing lateral pipework
Moleploughing 18th Fairway
Pipework installed on the 18th Fairway
Installing fairway sprinkler on 18th Fairway
Royal Portrush Golf Club, Northern Ireland
Moling fairway lateral pipework on the Dunluce Links
Moleploughing greens lateral pipework
Moleploughing tees lateral pipework
Installation of greens isolation valve assembly
Installation of water storage tank base
Completed Vulcan water storage tank
Salisbury & South Wilts Golf Club, Wiltshire
Mainline pipework installation
Mainline pipework and cable installed in open trench
Backfilling and reinstatement of trenches
Sprinkler just installed
Saunton Golf Club, North Devon
Moleploughing pipework around tee
Moleploughing pipework
Installation of sprinkler
Pump station installation
Stevenage Football Club, Hertfordshire
Rain Bird 950E sprinklers operating on pitch perimeter
Swinley Forest Golf Club, Ascot, Berkshire
Moleploughing 18th Green pipework
Moleploughing greens pipework
Excavating hole for sprinkler installation
Soldering twisted cable joints
Backfilling sprinkler installation
Sprinkler installation complete
Valve assembly just installed
Pump station being installed
Water storage tank and pump station during construction
Verulam Golf Club, Hertfordshire
Bespoke pump station designed and manufactured by MJ Abbott
Mainlines pipework installation
Backfilling trenches with compactor blade
Mechanically sweeping trenchlines
Moleploughing greens pipework
Installation of isolation valve assembly
Vulcan water storage tank and pumphouse
System handover at Verulam Golf Club
Warwickshire County Cricket Club, Edgbaston
Edgbaston
Edenbrook Country Park, Fleet, Hampshire
Established wetland and weir
Construction of wetland
Shaping wetlands using Engcon attachment
Culvert construction
Pond construction
Excavating new drainage ditches
Golpla sales access road construction
Pipework from detention pond
Timber boardwalk and path construction
Large wetland being filled
Completed wetlands
Large culvert
Sales access road completed
Meadow area
Wetlands
La Moye Golf Club, Jersey
New 12th Green nearing completion
11th Green prior to reconstruction
Turf removal from 11th Green
Stripped greens turf laid out and maintained ready for later re-use
11th Green with rootzone
11th Green prepared for turfing
Shaping 11th Green surrounds
Stripping topsoil from the 12th Green surrounds
Topsoil stripped on 12th Approach
Shaping 12th Approach and dunes
New 12th Green and bunkers
Placing rootzone layer to the 12th Green
Re-laying turf to 12th Green
Shaping 12th Green dune surrounds
Replacing dunes grass to 12th Green surrounds
Burnham Beeches Golf Club, Buckinghamshire
Completed reservoir with aeration
Stripping topsoil
Subsoil cut and fill
Subsoil cut and fill earthworks
Reservoir prior to liner installation
Geotextile underlay being installed
Reservoir following liner installation
Topsoil being replaced around top and sides of reservoir
Burnham Beeches Golf Club clubhouse
Shaftesbury Estates, Dorset
Removal of trench support system
Installation of dewatering tubes
Installation of dewatering tube
Dewatering and preparing for excavation
Arrival of tanks from Carlow Concrete
Placement of tanks by Hiab crane
Tanks in situ
Concrete backfill placement
Inlet manhole, balance tank and reactor tank
Installing utility services
Nutbourne House, Surrey
Dozer regrading the lake edge
Trimming sub-base prior to topsoil re-spread
New lake with waterfall
Lake and lawn areas after shaping
View of lake from new carriage drive
The Classic Architecture Company, Wiltshire
Landscaping works completed
Construction of swimming pool
Installing pipes around garden
Private Client, New Forest
Cable and pipe installation showing sand placement
11 kVA cable drums
Cable and pipe installation by rotary wheel excavator
Cable and duct installation
Cable placement using Ditch Witch tracked unit
Tracked gravel cart
Placement of sand backfill
Compaction of sand backfill
Culvert reconstruction
Storage tank and pumps
Twin booster pump with variable speed motors
Cedars Nursing Home, Landford, Wiltshire
Construction of gravity manhole
Construction of concrete cover slab
Cover slab
Installation of pumping in highway verge
Installation of pumping main in highway
Installation of pumping main in highway verge
Post construction prior to seeding
Fonthill Estate, Wiltshire
Installation of treatment plant
Excavation ready to receive tanks
Delivery of first tank
Delivery of second tank
Tank placement by crane
Tank placement
Treatment plant installation
Control cabinet
Manor Farm, Wiltshire
Prior to tank placement
Excavation works
Dewatering pumps and boreholes
Dewatering borehole
Trench support manhole boxes
Cranage to place tanks
Tank placement by crane
Installation of waterproof seals
Treatment plant placement
Treatment plant in position
Control shed
Fordingbridge Rugby Club, Hampshire
Fordingbridge Rugby
Raymond Brown Construction, Hampshire
Accommodation units at McMullen Barracks
New Forest Park Authority, Hampshire
Post construction toilets, washdown and control kiosk
Booster pumps
External power socket
Hydrant point
Toilets, washdown and control kiosk - post construction
Reinstatement following cable installation
Site plaque
Worplesdon Golf Club, Surrey
Grading reservoir banks
Cut and fill earthworks
Earthworks
Reservoir earthworks
Topsoil screening
Directional drilling underliner drainage outlet from base of reservoir
Liner installation
Reservoir partially full
Norman Court School, Hampshire
Norman Court School
Anua Platinum sewage treatment plant
Plastic media which support bacterial growth
Salisbury Racecourse, Wiltshire
Racing at Salisbury
Thruxton Airfield, Hampshire
Aerial view of Thruxton Circuit and Airfield
Duct chamber
Duct chamber with cabling
Duct chamber and cover
Duct chamber showing tarmac reinstatement
Marina Developments, Berkshire
Bray Marina
Bray Marina toilet block
Pre-construction
Discharge manhole construction
Bray Marina office
Royal Portrush Golf Club, Northern Ireland
Installation of hardcore sub base
Hardcore sub base
Sub base prepared for concrete installation
Installation of concrete base
Installation of first wall ring
First ring seal poured within concrete base
Tank walls being constructed
Roof installation
Roof beam installation
Completed tank
Ashton Court Estate, Bristol
The entrance to Ashton Court
Route of water pipe
Post installation across fields
Surveying to create the as-laid plan
Valve chamber
Bossington Estate, Stockbridge, Hampshire
Grundfos DME digital dosing pump
Boyton Farms, Wiltshire
Mole plough and gravel cart under trees
Mole plough and gravel cart working
Concrete water trough
Catmore Farm, Oxfordshire
Water meter and isolation valve
New pumphouse and access
Borehole headworks incorporating EBCO sample tap
Pressure switch & gauge
Pressure vessel and electrical distribution
Pump control panel
Woltex water meter and isolation valve
WS Harding & Son, Fordingbridge, Hampshire
Twin pump variable speed booster system
Precolor pre-insulated water storage tank
Chitcombe Farm, Dorset
Delivery of reservoir
Unloading reservoir
Installation of pump chamber
Installation of pump chamber box
Installation of reservoir
Installation of reservoir chamber
Installation of reservoir lid
Pump chamber with weir spillway to comply with water bylaws
New spring chamber
Pipe route of 90mm high pressure line
Pipe route of 90mm high pressure line through woods
Pressure reduction chamber and bypass
Pump chamber showing pressure switch
Air valve
Wentworth Club, Surrey
Completed 18th Green and water feature
Construction of water feature at the 18th
Constructing 18th water feature
18th water feature gabion wall construction
18th Hole sleeper walling
Reconstruction of putting green
Turfing green and surrounds
Grading tee surface in preparation for turf
Turfing 8th Green edge
Completed water feature at the 8th Green
Work on the 18th
Turfing
Turf laying
Bunker construction
Greens drainage
The Grove, Hertfordshire
The Grove
The Stables and 1st Tees
Topsoiling edges of cart paths
8th Hole
4th Hole
Ashmore Farm, Ashmore, Dorset
Barrier pipe and fittings
Conholt Park, Hampshire
Winch drawn mole plough and gravel cart
Post mole ploughing
Trenching in water pipe
Borehole headplate
Pressure reduction valve and bypass
Water meter chamber
Domestic property fed off supply
Other domestic properties fed off supply
Conholt Park, Hampshire
Tank drain pipe
Existing tower
Erection of steel tower
Tower platform
Fixing down new tower
Inlet pipework
Tower and tank post construction
Tower and tank - post construction
Sadborow Estate, Somerset
Sadborow Estate web reporting system
IGD Services Ltd, Hertfordshire
Completed parking bay in use
Completed parking bays with boundary and bay markers
Gravel filled access with pre-grown turf filled bays on fast lay
Celtic Manor Resort, South Wales
Completed water feature
The Twenty Ten 18th Green during the Wales Open
Fairmont St Andrews, Scotland
Fairmont St Andrews, Torrance Course
18th Green, Torrance Course
Tidworth Garrison Golf Club, Wiltshire
11th greenside bunker during renovation works
9th greenside bunker following cattle damage
9th greenside bunker following revetted turf perimeter & re-soiling
9th greenside bunker following repair works
11th greenside bunker following cattle damage
11th greenside bunkers following renovation works
13th greenside bunkers prior to renovation works
13th greenside bunkers following renovation works
Shaping bunker
Re-constructing bunker
Les Aisses Golf, Orleans, France
Red Course, 3rd Green viewed from white tee
Red Course, 3rd Green during final preparation
Red Course, base for the new 9th Green
Red Course, topsoiling the surrounds of the 9th Green
7th Green, Red Course
White Course, 12th Green and approach during construction
White Course, shaping the 12th Green and approach
White Course, 13th Tees under construction
White Course, completed 13th Tees
White Course, 16th Green base and surrounds being shaped
Royal Mid-Surrey Golf Club, Richmond
View of the 10th Green from the approach bunker
15th Green drainage and bunker
12th Green
Burhill Golf Club, Surrey
Completed practice putting green, chipping green and pond
Practice chipping green drainage installation
Placement of rootzone to chipping green
Practice putting green irrigation
Practice tee and 3 No target greens
Practice facility car park
New path to practice tee and car park
Foxhills, Surrey
Completed pond with aerator operating
Site clearance
Installation of protective geotextile
Installation of pond liner
Final preparation to pond surrounds
Aerator control panel
The Royal Automobile Club, Surrey
Turf and topsoil strip on the 5th Fairway
Topsoil stripping
View from the old 5th Tees
Laying big roll turf to fairway
Laying big roll turf to the 5th Tees
Preparation and turfing works to fairway bunkers
Repositioned path alongside the 5th Tees
Completed fairway bunkers and fairway re-alignment
Northwood Golf Club, Middlesex
View of slippage to embankment at 9th Tee
Temporary pipe installation for managing water flow
Excavating base for sleeper installation
Completed sleeper detail
Reinstating tee bank
Private Client, Devon
View of new ponds from upper tier
Intial site clearance viewed from upper tier
Stone reclaimation from site clearance
View of pond location from lower tier
View of lower pond site from upper tier
Construction of stone waterfall feature
Completed waterfall feature using reclaimed stone
Installation of protective geotextile
Installation of pond liner
Laying flag stones viewed from the trees
Upper pond waterfall
View across lower pond to first waterfall
View of re-routed stream from the lower pond
Completed upper pond viewed from the trees
The Runnymede Hotel, Surrey
View of front of hotel over new meadow
Finished lawns at the rear of the hotel
Looking back towards the entrance
New orchard
Refurbished sand filled tennis courts
Tennis court surface
Refurbished two tone macadam tennis court
Perimeter path to the rear of the hotel
The Duke's Course, St Andrews, Scotland
Completed 17th Fairway bunker
Installation of drainage to the new 16th Green
Shaping of the 18th Green surrounds
Final preparation and grading of the 16th Tees
Seed germination on the 15th Green and approach
Seed germination on the 16th Hole
17th Tees with bunker extending from tee to fairway
The Duke's clubhouse from the 18th Green
Royal Wimbledon Golf Club, London
Coring out 18th Green sub base
Initial turf stripping of 18th Green and approach
Initial shaping of 18th Green surround
Rootzone placement to 18th Green
Shaping 18th Green approach
Harewood Downs Golf Club, Buckinghamshire
New 5th Green
Installation of drainage to the 12th Green
Installation of the gravel layer to the 12th Green
New 11th Green
Old Reigatians RUFC, Surrey
Old Reigatians RUFC
Old Reigatians RUFC, Surrey
Old Reigatians RUFC with the floodlights in the background
National pump hire company
Internal view of control panel
Front view of control panel
Rear view of control panel
Ansty PYO Maize Maze, Wiltshire
2009 Maize Maze
MCC, Lord's Cricket Ground, London
The Pavilion at Lord's
England v Sri Lanka at Lord's
Lord's Cricket Ground
Royal Cromer Golf Club, Norfolk
System handover at Royal Cromer Golf Club
Royal Cromer Golf Club
Sprinklers in action at Royal Cromer Golf Club
Balston Agius Landscape Architects, Berkshire
D6N ready to spread and shape the excavated material from the lake extension
Initial topsoil strip in area of archaeological interest
Earthworks and shaping in progress
Existing lake drained down and earthworks in progress, extending the lake and shaping the surrounds
Cleaning out and desilting of clay-lined Victorian swimming pool
Cleaned out concrete-lined Victorian swimming pool to be repaired following damage from tree roots over many years
New Opepe timber walkway under construction between clay and concrete Victorian swimming pools
Looking through route of proposed outfall drain into lake site
Clay backfilled electricity trench to be cleaned out and topsoiled
View down from the new property, looking into the finished lakes and surrounds
Newly installed jetty looking into the completed lake
Completed Opepe hardwood decking and contemplation area
Contemplation area on decking between clay and concrete Victorian swimming pools
Completed Victorian swimming pool area with Opepe hardwood decking and contemplation area
New 4m x 4m Opepe hardwood jetty for future boat house
The Grove, Hertfordshire
Completed practice tee
Use of boards to protect the working area
Installation of blinding layer to sub-base
Installation of tee surface
Completed practice tee and pathway ready for play
Harpenden Golf Club, Hertfordshire
Harpenden Golf Club, Hertfordshire
Completed works to 11th Green and surrounds
Woking Golf Club, Surrey
Completed 16th Green
Site of new 16th Hole at Woking Golf Club
Construction commences
Construction work to new 16th Tee in progress, with existing 15th Green in foreground
Completed green with partially completed new bunker in foreground
View from behind new 16th Green back towards new 16th Tee
View of new 16th Green from front of new 16th Tee
Reconstruction works complete and growing in
Aylesbury Vale Academy, Buckinghamshire
Primary drainage installation
Sand application in progress
Sand application prior to seeding
Grass starting to germinate
Grass establishing
Ford Lane Recreation Ground, Ferndown, Dorset
Stonepicking operations
Stripping topsoil
Topsoil re-spread following cut and fill earthworks
De-compacting topsoil prior to final grading
Primary drainage installation
Seeded pitch
Fernhurst Recreation Ground Trust, Surrey
Deep drainage being installed through area of running sand
Running sand was encountered beneath a large section of the site
CAT D6 during initial earthworks
CAT D6 nearing completion of cut and fill earthworks
Formation beginning to take shape, whilst being hampered by testing weather and ground conditions
Shallow cultivation of topsoil following drainage installation
Pitch following initial 3 cuts, on target to be ready for use by September 2013
Private Client, Bath, Somerset
Installing the Rewatec Solido unit
Stripping the site
STP installed, ready for backfilling
Installing the gravity discharge pipe
Installation complete
Private Client, Blandford, Dorset
Removal of spoils by mini excavator and dumper
Access to the site from a country lane
Excavating the site
Work in progress
Installation complete
Private Client, Tadley, Hampshire
Delivering the sewage treatment plant
Preparing the site to commence excavation
The narrow site access
Working off boards to protect the lawn
Work in progress
Concrete base for sewage treatment plant
Installation ready to backfill
Codford Village Hall, Wiltshire
Excavation in progress
Trench support and dewatering pumps
Installing the concrete surround
Plant installed, ready to remove trench support system
Installing the sewer drains to the plant
Trenching works in progress
Sewer drain pipes completed and re-turfed
Completed installation, ready for seeding
Private Client, Wiltshire
The completed pond
Excavation works in progress
The pond taking shape
Due to the wet ground conditions, a tracked dumper was required to transport materials
Landscaping complete, waiting for the pond to fill
The RSPB, Winterbourne Downs, Wiltshire
Construction in progress
Butterfly bank under construction
Operator Peter Jay discussing the work with RSPB's Patrick Cashman
New butterfly bank from the air
Butterfly bank from the reserve entrance
The National Trust, Greys Court, Henley-on-Thames
Completed access track and parking bays in use
New pathway and timber bollards
New pathway with timber edging
Surrounding areas complete and seeded
Access track and parking bays in use
Access track entry splay showing new kerbs
ITV filming at Greys Court for 3rd series of Downton Abbey (c) ITV
Close House Hotel & Golf, Newcastle
The newly renovated Filly Course in play
New fairway bunkers and greens complex on 1st Hole following initial shaping works
New fairway bunkers on 1st Hole following turfing
New fairway bunkers and greens complex on 1st Hole, complete
Shaping new bunkers
New fairway bunkers on 2nd Hole
New pond and mounding at 5th Green
Construction of new 7th Green in progress
7th Green complex following turfing
8th Hole prior to construction of new pond
8th Hole after construction of new pond
New 17th Tee ready for turfing
Long Ashton Golf Club, Bristol
Installing gravel carpet on 9th Green
Removing turf on 4th Green
Stripping 1st Green
Installing drainage on 18th Green
Stripping 16th Green
Installing drainage on 11th Green
Checking gravel carpet levels on 14th Green
Installing rootzone on 14th Green
Installing rootzone on 15th Green
Checking rootzone levels on 17th Green
Turfing in progress on 17th Green
Turfing in progress on 4th Green
Installing irrigation at the 4th Green
Installing drainage outfall pipe at 4th Green
4th Green complete and handed over
Rye Golf Club, East Sussex
Rye Golf Club
Rye Golf Club - Clubhouse
Addington Palace Golf Club, Croydon
Toro DT35 sprinklers in operation
Irrigation operating on chipping green constructed by MJ Abbott
Addington Palace Golf Club
Royal Porthcawl Golf Club, South Wales
Moling in the new irrigation mainline
Royal Porthcawl Golf Club
Winter Hill Golf Club, Berkshire
Moleploughing tee irrigation pipework
New irrigation water storage tank
Moleploughing irrigation pipework
Winter Hill Golf Club
Panoramic view of golf course
Copt Heath Golf Club, Solihull, West Midlands
Copt Heath Golf Club
18th Hole and Clubhouse
15th Green
Effingham Golf Club, Surrey
Effingham Golf Club
London Irish Rugby Club, West London
Aerial view of Pitch 1 and Pitch 2
Strip out and demolition of golf clubhouse
Clubhouse removal
Breaking up of driving range foundations for re-use
Stripping topsoil
Earthworks
Cut and fill earthworks to form pitch plateau
Bulk earthworks with scraper and box, dust suppression on haul routes
Trimming formation with laser guided dozer
High energy impact compaction to 3G artificial pitch plateau
Installation of primary drainage trenches
Installation of 3 layer liner system over formation
Installation of rugby post sockets
Completion of drainage following lining of plateau
Careful spreading of topsoil between drainage cone profile
Pitch 1 prior to gravel raft installation
CAT D6N dozer with 3D Total Station grading attachment spreading a gravel raft layer
Final roll of Pitch 1 following seeding
Pitch 1 germination within a week of seeding
Seeding plateau area
Lining irrigation lake with topsoil prior to liner installation
Topsoiling over lined embankments within the irrigation lake
Spreading sub base for 3G artificial pitch
Overview of 3G artificial pitch construction
Installation of 3G pitch rubber shockpad
Laying 3G rubber shockpad layer
Installation of 3G surface
Installation of Rhino synthetic turf
Independent testing to achieve IRB 22 certification
Completed Rhino Turf 3G pitch
Soft Fruit Farm, Hampshire
Punnet of strawberries
Strawberry crop under a polytunnel
Dynapac Trencher and Ground Drive Gravel Cart
Dynapac Trencher installing lateral drainage pipe
Outfall headwall
Private Client, Dorset
Installing lateral drains
Installing carrier drain using excavator
Outfall headwall
Harrow School, West London
Cricket square during grow-in by Harrow School
View of pavilion prior to commencement of works
Cut & fill earthworks in progress
View towards pavilion following subsoil shaping during sewer diversion works
Earthworks in progress and cricket square under construction
Initial placement of cricket loam
Laser grading to cricket square
2-6mm gravel placed between drainage runs ready for Advanedge laying
Topsoil re-spreading in progress
Topsoil re-spread over gravel raft around establishing cricket square
Topsoil re-spread to surrounds prior to sand spreading and amelioration works
Cricket square and surrounds during grow-in by Harrow School
Cricket outfield following initial grow-in by Harrow School
King Edward VI Community College, Totnes, Devon
Cut & fill earthworks to pitch formation
Existing sloping field prior to commencement of works
Drainage installation to pitch following earthworks and topsoil re-spread
Completed pitch during initial grow-in
The Carrick on Loch Lomond, Scotland
The Carrick on Loch Lomond
Fairway centre line staked prior to construction
Fairway construction works in progress
Construction of 3rd Green
4th Green, looking towards Tees
4th Tees under construction
4th Hole from Tees
Newly constructed 7th Green
View down 8th Fairway with sprinklers operating
Installing drainage on 13th Hole
Dynapac 1800 Trencher on 13th Hole
View down newly constructed 14th Hole
14th Hole in play
Newly constructed revetted bunker
15th Hole in play
Ramside Hall Hotel & Golf Club, Durham
Hitachi excavator carrying out shaping works
Stripping turf from existing green
Stripping turf
Stripping existing topsoil and rootzone
Mastenbroek 15-15 sportsfield trencher
Flackwell Heath Golf Club, Buckinghamshire
Shaping greenside bunker - Hole 2
Hole 2 - Filling in approach bunker
Hole 2 - Reconstruction of greenside bunker
Hole 2 - Shaping greenside bunker
Hole 4 - RH greenside bunker re-shaped, edged, drained and re-soiled
Hole 4 - Greenside bunkers re-shaped
Hole 9 - LH greenside bunker re-shaped, edged, drained and re-soiled
Royal Mid-Surrey Golf Club, Richmond
Re-soiling to green surrounds
One-way badger gates installed in bunker
One-way badger gate installed in bunker
Coring out green base
Placement of subsoil fill material for shaping
Shaping of mounds adjacent to Kew Gardens
Placement of gravel raft
Placement of gravel raft and installation of irrigation to green
Rootzone delivered to newly constructed green for placement
Rootzone placement to green
Placing rootzone on newly constructed green
Shaping of green surrounds
Re-soiling green surrounds
Turfing green surrounds
Laying turf to green surrounds
Mist irrigation to bunker turfing
Shaping of approach bunker
Installation of soakaway vertical riser
Cultivation and seeding works
Water first enters wetland feature
Private Client, Cheshire
Re-soiled cascade feature
Existing view from proposed formal lawn, towards proposed main pond
Existing view looking back at house over proposed main lake
Looking back at house during initial rear lake construction in running sand
Looking from new drive to marked out front lake, prior to earthworks
Looking back over rear lake, prior to under liner drainage installation
Hedge planting and re-soiling to perimeter shelter belt trees
Planting the willow on the back lake island
Topsoil re-spread in progress
Back lake under liner drainage chamber installation
Deep drainage being installed from front lake under liner drainage chamber to dewater future basement
Front lake following earthworks and under liner drainage installation
Back lake following liner installation
Initial rock placement for overflow stream and cascades
Topsoil re-spread to lake banks over Secumat erosion control matting
Early establishment of lake banks and island following seeding
Topsoil re-spread to front lake surrounds
New driveway sub-base installed and surrounds shaped and re-soiled
Surrounds of front lake following initial cultivation works
Surrounds of back lake following cultivation and seeding works
New access drive following turfing to immediate surrounds
Back lake flowing through rocks and cascade feature down stream
Back lake full, looking up towards house at start of stream
Private Client, London
Architect's design vision
Architect's project site plan
Building site prior to landscaping
Woodland view prior to landscaping
Indoor-outdoor pool with hardwood deck surround
Lawn area in front of the house
Lawn laid, decking being finished
Patio, deck and lawn from the house
Private Client, Hampshire
Completed walled garden, drive and Golpla areas
View from ha-ha between main buildings, prior to commencing landscaping works
View of first building with one of the large subsoil heaps which required to be incorporated into the landscaping
View from garage up towards main building, prior to shaping and driveway works
Area between buildings, prior to commencing landscaping works
View through ha-ha prior to commencing landscaping works
View towards rear building, prior to shaping works
Existing access prior to commencing landscaping works
Construction of new driveway over site access route, and shaping of surrounds
View between buildings following shaping, topsoil re-spread and tree planting prior to cultivation and seeding
View from ha-ha following construction works, during stone raking prior to stone picking and final cultivation and seeding
View through ha-ha following re-shaping and topsoil re-spread works
View towards rear building, following shaping and topsoil re-spread works
View down towards garage past main building, following shaping and topsoil re-spread
Walled garden, drive and Golpla sub-base under construction
Hull City Tigers Football Club
Cut and fill earthworks
Removal of vegetation with Koro fraise mower
Installation of upper rootzone with GPS guided dozer
Water storage tank and pump station kiosk
Pitch following seeding
First cut by groundstaff
Pitch following first team training session
Aldershot Town Football Club
Spreading fibre-rootzone on pitch
Gravel slits installed
Spreading fibre-rootzone
Pitch establishing well just a week after seeding
Hook Parish Council, Hampshire
Laser guided dozer
Removal of topsoil
Installation of primary drainage system
Primary drainage installation
Upper Horfield Primary School, Bristol
Completed pitch
Rolling dynamic layer
Rolling dynamic regulating layer
External view of completed pitch
Cirencester Town Council, Gloucestershire
Soil investigation survey for hazardous materials
Vegetation and topsoil strip from adult pitch extension area
Rotavating existing grass cover prior to stripping topsoil on junior pitches
Adult pitch during grow-in maintenance by the Council
Junior pitches during grow-in maintenance by the Council
Little Malvern Court & Gardens, Worcestershire
Little Malvern Court & Gardens
Existing overflow structure from far side of lower lake
Existing structure from top pond
De-silting under way
Excavator stirring silt to enable slurry tanker to pump silt from lake
Lake de-silting complete
Foundation laid and overflow wall structure works start
Final works to surrounds following completion of cascade works
Completed cascades from lower lake
Completed cascade with new bridge construction and planting underway by the garden teams
Private Client, Cheshire
Long pond area following re-turfing works
Existing lawn areas
Existing soil being removed, sub base graded and new rootzone placed to formation
Central area of main lawn prepared and ready for turfing
The Meath Epilepsy Trust, Godalming, Surrey
The Meath Epilepsy Trust
Proposed route of access road
Proposed access on to existing road
Tree protection fencing
Tree protection fencing showing overhanging branches
Turf removed from no-dig area
Timber edging installed
Installation of 150mm Cellweb
Installation of Cellweb and infill with organic Type 3 sub-base material
Completed access road with tree protection fencing in place
Hunstanton Golf Club, Norfolk
Hunstanton Golf Club
Hunstanton Golf Club - Clubhouse
Royal Jersey Golf Club, Jersey
Moleploughing lateral pipework
Moleploughing greens pipework
Stunning sea views from Royal Jersey Golf Club
Royal Jersey Golf Club
St Andrews Links Trust, Scotland
General view of pump station
Pump suction pipework
Pump discharge pipework
Manifolds being fabricated in MJ Abbott Workshop
Discharge manifolds (foreground) with pumps at the rear
Pump discharge pipes to golf courses
Siemens Mag Flo flow sensor
Grundfos VFI flow sensor
Grundfos CU352 pump controller
Mains power intake
Bespoke pump station control panel
Touchscreen display of system information
Toro irrigation controllers
Storage tank PH displays
Willie Redpath, St Andrews Links Trust (L) and Adrian Mortram, Robin Hume Associates (R)
Willie Redpath, St Andrews Links Trust (L) and Jim Price, MJ Abbott (R)
The Swilcan Bridge at St Andrews
The Old Course at St Andrews
HM Prison Portland, Dorset
Completed pitch
Pitch in use
Woburn Golf Club, Buckinghamshire
The 9th Hole on the Marquess' Course, Woburn
New control panel
New control panel being commissioned
Grundfos CU352 display
Flow meter display
New zone isolation panel
New zone isolation panel - open
The Grove, Hertfordshire
NFL team Jacksonville Jaguars training on pitch
Removing existing pitch surface with Koro fraise mower
Sand slits installed
Rootzone ready for turf
Turfing in progress
Close up of Eclipse reinforced turf
Laying turf
Watering newly laid turf
Channel drain along edge of pitch
Parking and marquee area
Pitch marked out ready for NFL training session
Halesowen Golf Club, West Midlands
16th Green before and after new drainage installed
16th Green prior to drainage installation (February 2014)
Drainage installation to 16th Green with laser guided chain trencher working from boards
Trench installation with spoil discharged to tipping trailer
16th Green following re-turfing works by the Club
16th Green in January 2015, following drainage works in Autumn 2014
Chelmsford Golf Club, Essex
Chelmsford Golf Club
Primary drainage installation using chain trencher: approach drains seeded, greens drainage re-turfed
Primary drainage installation: turf re-laid on front of green with turf set to one side for re-use on next drain
3rd Green following primary drainage installation
Royal Winchester Golf Club, Hampshire
Royal Winchester Golf Club
17th Green prior to drainage works, following 15mm of rain the previous night
Trench excavation with laser guided chain trencher discharging into trailer, machines working from boards
Trench installation, sweeping debris from boards onto chain which is removed from area into trailer
Drainage installation
Gravel placement into trench following pipe laying
17th Green after drainage installation, following 20mm of rain the previous night
Molson Coors Brewery, Alton, Hampshire
Molson Coors products
Molson Coors Brewery, Alton, Hampshire
Existing wellhead assembly
Existing rising main (L), existing pump removed (R)
Severe corrosion of existing rising main
Lower Pertwood Organic Farm, Hindon, Wiltshire
Stripping easement
Excavation of trench in chalk
Pipe and cable installation, showing marker tapes
Pressure reduction valve with metered bypass
Completed pressure reduction valve chamber
Woburn Golf Club, Buckinghamshire
3rd Green, The Duke's Course
Bunker shaping
Greens shaping
Rootzone and preparation
Final preparation
Early establishment
Green establishment
Irrigating new green
Golf At Goodwood, Chichester, West Sussex
The Downs Course, Golf at Goodwood
Hole 4 approach bunkers
Hole 4 fairway bunker
Hole 9 greenside bunkers
Hole 10 approach bunker shaping
Hole 10 approach bunkers
Hole 16 fairway bunkers
Hole 16 greenside bunker
Private Client, Hampshire
3rd Fairway and approach during grow-in maintenance
Proposed golf course area
Example of the size and quantity of stones within the topsoil
Machinery arrives ready to start on site
Kongskilde Stonebear stone picker and tipping trailer working across site
Following stone picking, the area is stone buried and grade rolled
A small quantity of the stone picking arisings prior to being removed from site
Ripped fairway with green construction and cultivation works in the distance
Short game area green under construction
Final cultivated fairway and approach to 3rd Green
3rd Fairway preparation in progress with short game area on left and 4th Hole on right
3rd Green and short game area
1st Approach and Green
Seeding to 2nd Fairway and Green surrounds
Initial germination of 2nd Green approach and surrounds
Golf course area during grow-in maintenance
Looking across 3rd Fairway to short game area with 3rd Green in distance on left
3rd Fairway, short game area on left and & 4th Hole on right duing grow-in maintenance
Private Client, Hampshire
Fishing lodge
Sewage treatment plant excavation
Installing concrete sewage tank
Balance and reactor tank
Installing concrete reservoir
Borehole drilling
Base for control kiosk
Control kiosk
Retaining wall
French drain behind retaining wall
Head of geothermal recharge trench
View of existing stream
Damming existing stream
Inflatable dam
New chalk-lined stream
Partly constructed footbridge and weir
View of silt trap
View upstream
Landscape
The John Lewis Partnership, Hampshire
View of perimeter road and caravan bays after grass establishment
Prior to commencement
Site mobilisation
Removal of existing hedges
Site clearance
Excavation of turning head
View of access during construction
Starting installation of REWATEC sewage treatment plant
Installation of REWATEC sewage treatment plant
Connection of sewage treatment plant
Excavation of large soakaway
Perforated soakaway system
Foundation for soakaway crate system
Funke crate system - rainwater
Connection of new water mains
Construction of concrete beam and block floor slab
Building floor slab
Construction of clubhouse building
Disabled access slabs
Kerbing around clubhouse
Topsoiling of play area
Construction of Neoweb perimeter road
Perimeter road finished with cotswold path gravel
Caravan bays
View of caravan bays after grass establishment
Shaftesbury Estates, Dorset
Pile mat
Excavation with trench support and dewatering equipment
Creation of pile mat
Concrete reinforced pile
Removal of pile mat
Aberdovey Golf Club, North Wales
Aberdovey Golf Club
Stripping old green
Bulk earthworks
Moving sand stockpile
Build-up of dunes to support new green
View of works in progress from the tee
New green with rootzone installed
Green complete with germination blanket and surrounds turfed
Completed green with germination blanket and wind protection fencing
Dunes reshaped and slabbed or turfed
Turfed and slabbed green approach
Cockleshell path from new green
Cockleshell path and turfed shaped runoff area at rear of green
Reinstatement of sand stockpile area
Royal Blackheath Golf Club, London
Royal Blackheath Golf Club
3rd hole prior to commencement
3rd hole with turf stripped
Works in progress on 3rd hole
Ditching works on 3rd hole
3rd hole on completion of works
Reconstructed bunker on left of 3rd green
Reconstructed bunker on right of 3rd green
Installing drainage
New drainage outfall headwall
Works in progress on 15th hole
Shaping works on 15th hole
15th hole on completion of works
Works in progress on 16th hole
Greens turf stripped and stored on sheets for re-use
Works in progress on 16th green
Work in progress on 16th green
Resoiling surrounds on 16th hole
16th hole on completion of works
Vidauban Golf Club, France
Vidauban Golf Club, Hole 2
Drainage works on 5th fairway
Drainage crew in action
Fairway drains ready to top up with sand
Completed fairway drains
Trenching irrigation mainline with rock wheel
Installing tee irrigation
Trenching tee lateral with rock wheel
Installing bunker drainage
Preparing surface of new putting green and turfing surrounds
Hull City Tigers Football Club
First team training
Construction of Plateau 2
SISGrass installation on Plateau 2
SISGrass installation on Pitch 1
SISGrass installation to Plateau 2
Chelsea Football Club, Cobham Training Ground
Stripping vegetation with Koro fraise mower
Completed match pitch
Stripping topsoil from match pitch
Primary drainage installation on match pitch
Installation of lower sand layer on match pitch
Grading upper rootzone on match pitch
Final cultivations prior to seeding match pitch
Grade rolling training pitches
Training pitches following seeding
Seeded match pitch technical area
Established training pitches
SISGrass installation into established match pitch
SISGrass installation
St George's Park National Football Centre
Paul O'Connell and other members of the Ireland squad training for the Rugby World Cup
Rootzone graded prior to seeding
SISGrass installation
Argentina squad training for the Rugby World Cup
Ireland training for the Rugby World Cup
Somerset County Cricket Club, Taunton
The County Ground, Taunton
Ground protection boards in use
Drainage in progress
Installing drainage laterals on the outfield
Bristol Rovers Football Club, New Training Ground
Drainage installation
Site clearance
Cut and fill earthworks
Primary drainage
Installation of gravel raft
Sand installation
Rootzone installation
Fibre installation
Pitches establishing
Pitches growing in
Completed pitches
Chelsea Football Club, Kingsmeadow Stadium
Kingsmeadow Stadium pitch
Chelsea Football Club, Stamford Bridge Stadium
New pitch surface
Removal of existing pitch
Stripping existing surface
Re-grading lower sand
Installation of new rootzone
SISGrass stitching
Stamford Bridge pitch
Millwall Football Club, The Den Stadium
Irrigation
Removal of existing pitch profile
Primary drainage installation
Gravel layer installation
Lower sand preparation
SISGrass stitching
Newcastle United FC, First Team Training Pitch
SISGrass installation
Pitch removal
Drainage installation
Primary drainage installation
Gravel carpet
Lower sand installation
Rootzone preparation
SISGrass installation
Newcastle United FC, St James’ Park Stadium
Match day
Rotovating the pitch
Stripping the old pitch
Exposing existing drainage slits
Importing the rootzone
Spreading rootzone
Rootzone spreading
SIS hydrobox installation
Preparation and seeding
SISGrass stitching
Sprinkler with cap
Reading FC, Bearwood Park Training Ground
Underground water tank installation
Earthworks
Trenching cut off drainage
Pitch plateau drainage
Trenching
Gravel raft installation
Sand layer installation
Landscaping perimeters
Grading first team pitches
Topsoil preparation
Sand amelioration into topsoil based pitches
SISGrass installation on first team pitches
Academy pitches
First team area
Match pitch
Reading Football Club, Madejski Stadium
Rootzone preparation
Vegetation removal
Pitch removal
Grading existing sand layer
Slit drainage
Undersoil heating installation
Installation of rootzone
Seeding
SISGrass installation
Southampton Football Club, Staplewood Campus
New sand layer import
Koro off vegetation
Removal of existing pitch
Sand spreading
Rootzone spreading
Construction of retaining wall and pitch extension
SISGrass stitching
SISGrass stitching
Pitch marked for training session
News
Shop
About our shop
Visit our shop
Resources
Company brochure
Product guide
Video galleries
Projects video gallery
Machinery video gallery
Products video gallery
Media information
Links
Work for us
Electrical Pump Engineer
Ground Workers
Water Engineers
Tractor/Trencher Operators
Golf & Sports Finishers
Trainee Irrigation Engineers
Marketing Assistant
Trainee Contracts Supervisor
Irrigation Service Engineer
Welder / Fabricator
Contact
Homepage slideshow