Stockley Academy, West London

Construction of sports pitches

MJ Abbott successfully tendered for the contract to reconstruct an existing sports pitch at Stockley Academy, which was part of a large redevelopment project carried out by Costain Ltd.

MJ Abbott carried out the following scope of works:

  • Remove vegetation and strip existing topsoil from pitch area of 9,000m²
  • Pass topsoil through screener to remove all foreign matter from the soil and stockpile in a weatherproof heap
  • Expose existing drainage tops and regrade subsoil formation
  • Import and spread 125mm depth of sand carpet
  • Re-spread screened topsoil
  • Import and spread 100mm depth of new topsoil and introduce ameliorated sand
  • Installation of sand banding to a depth of 265mm to make contact with the existing drainage
  • Cultivate and seed plateau area
  • Carry out annual maintenance, including grass cutting, overseeding and rolling.