The scope of work included for the construction of 4 no natural turf pitches, cricket square and MUGA. MJ Abbott secured the contract following a successful tender submission to Shepherd Construction.
MJ Abbott carried out the following scope of works:
Natural Turf
- Removal of vegetation from 5 hectares of existing topsoil
- Strip clean topsoil to full depth, pass through screener to remove foreign matter and stockpile in a weather protected heap outside of construction areas
- Cut and fill 33,000m³ of subsoil using laser controlled dozer and excavators to create level plateau areas
- Primary drainage installation with laterals at 7 metres centres, secondary drainage in the form of forced sand slitting at 1 metre centres to the entire plateau
- Subsoil de-compaction, topsoil re-spread, cultivations and seeding
- Installation of cricket square
- Carry out first year's maintenance regime including grass cutting, spraying and overseeding.
Synthetic Facilities
- Construction of MUGA comprising tennis/netball courts.