Underground water tank installation
Underground water tank installation
Underground water tank installation
Earthworks
Trenching cut off drainage
Pitch plateau drainage
Trenching
Gravel raft installation
Sand layer installation
Landscaping perimeters
Grading first team pitches
Topsoil preparation
Sand amelioration into topsoil based pitches
SISGrass installation on first team pitches
Academy pitches
First team area
Match pitch
 
 

Reading FC, Bearwood Park Training Ground

Construction of new training facility

MJ Abbott Ltd successfully designed and tendered the construction of pitches at Reading Football Club’s new training ground, Bearwood Park. Work was carried out for main contractors McArdle Sport-Tec Ltd.

Andy Cole of iTurf Management was employed as sports turf consultant, to oversee material selection and monitor construction.

The project scope included:

  • Trimming pitch plateaus provided by others
  • Installation of primary and secondary drainage systems
  • Irrigation system complete with underground water storage tank
  • Installation of pitch undersoil heating system
  • Import and spread new gravel raft, lower sand and upper rootzone layers including fibre on some pitches
  • Re-spreading of salvaged topsoils, complete with sand introduction for improvement
  • Preparation and seeding of pitch surfaces
  • Construction of landscaped perimeters
  • SISGrass stitching to first team pitches
  • Provision of grow in maintenance

www.readingfc.co.uk

Follow us on Facebook Follow us on Twitter See our videos on You Tube Find us on LinkedIn