Reconstruction of bowling green at Scunthorpe Academy

The scope of work included for the re-construction of 2 no six lane bowling greens.

The work was successfully tendered and was carried out for the client, North Lincolnshire Council.

MJ Abbott carried out the following scope of works:

  • Strip the existing bowling green surfaces and remove spoil off site to tip
  • Form new graded sub base and surrounds
  • Installation of secondary drainage system in the form of gravel banding
  • Import and spread rootzone, compact, grade and prepare for turfing
  • Apply pre-turf fertiliser and supply and lay fescue/bent turf to surface
  • Reinstate all access routes.

Since the reconstruction, MJ Abbott has carried out maintenance work on the greens.