Newcastle United FC, First Team Training Pitch
Construction of SISGrass hybrid turf pitch
The following scope of works was carried out with assistance from sports turf consultants PSD and industry partners Premier Pitches Ltd:
- Excavate and disposal of 450mm depth from existing pitch area of 9,000m²
- Cut and fill earthworks to create sub base and new pitch levels
- Installation of drainage, irrigation and undersoil heating systems
- Import and spread new gravel raft, lower sand and upper rootzone layers
- Preparation and seeding of pitch surface
- Installation of SISGrass hybrid pitch reinforcement system
- Construction of landscaped perimeters and improvements to the existing irrigation mainline