Irrigation
Irrigation
Irrigation
Removal of existing pitch profile
Primary drainage installation
Gravel layer installation
Lower sand preparation
SISGrass stitching
 
 

Millwall Football Club, The Den Stadium

Construction of SISGrass hybrid turf pitch

The following scope of works was carried out in accordance with the specification produced by Andy Cole of iTurf Management:

  • Excavation and disposal of 450mm depth from existing pitch area
  • Cut and fill earthworks to create sub base and new pitch levels
  • Installation of drainage, irrigation and undersoil heating systems
  • Import and spread new gravel raft, lower sand and upper rootzone layers
  • Preparation and seeding of pitch surface
  • Installation of SISGrass hybrid pitch reinforcement system

www.millwallfc.co.uk

Follow us on Facebook Follow us on Twitter See our videos on You Tube Find us on LinkedIn