Millwall Football Club, The Den Stadium
Construction of SISGrass hybrid turf pitch
The following scope of works was carried out in accordance with the specification produced by Andy Cole of iTurf Management:
- Excavation and disposal of 450mm depth from existing pitch area
- Cut and fill earthworks to create sub base and new pitch levels
- Installation of drainage, irrigation and undersoil heating systems
- Import and spread new gravel raft, lower sand and upper rootzone layers
- Preparation and seeding of pitch surface
- Installation of SISGrass hybrid pitch reinforcement system