Melksham Oak Community School, Wiltshire
Construction of natural and synthetic sports facilities
The scope of work included for the construction of 9 no natural turf pitches and artificial facilities including hockey pitch, MUGA, cricket practice nets and long jump. MJ Abbott secured the contract following a successful tender submission with Cowlin Construction.
MJ Abbott carried out the following scope of works:
Natural Turf
- Removal of vegetation from 15 hectare area of existing topsoil
- Strip clean topsoil to full depth and stockpile in a weather protected heap outside of construction areas
- Cut and fill 35,000m³ of subsoil using laser controlled dozer and excavators to create level plateau
- Primary drainage installation with laterals at 5 metres centres
- Secondary drainage in the form of forced sand slitting at 1 metre centres to the entire plateau
- Subsoil decompaction, topsoil re-spread, 1200 tonnes of sand applied and ameliorated into the topsoil, cultivations and seeding
- Installation of cricket square
- Carry out 2 year full maintenance regime.
Synthetic Facilities
- Construction of synthetic hockey pitch complete with provision of goals and nets
- Construction of MUGA comprising 5 no tennis/netball courts
- Installation of long jump, high jump, shot put and discus circles, cricket practice nets and artificial cricket wicket.