High Post Golf Club - 9th Hole
High Post Golf Club - 9th Hole
High Post Golf Club - 9th Hole
High Post Golf Club - 14th Hole
 
 

High Post Golf Club, Wiltshire

Installation of new irrigation system

MJ Abbott secured the contract to install a new irrigation system at High Post Golf Club following a tender and interview process. The irrigation design and tender process was undertaken by Adrian Mortram of Robin Hume Associates.

The scope of work included:

  • 22m³/hr pump station designed and manufactured by MJ Abbott, with pump suction from existing water tank
  • Fabrication and installation of new timber pumphouse building
  • Installation of mainlines pipework and replacement irrigation to greens, approaches and tees
  • The system utilises Rain Bird irrigation equipment.
  • The system includes Rain Bird Stratus LT control system and radio remote control.

Peter Hickling, Secretary, commented: “From the outset of the project, Abbotts worked cohesively with me to determine a highly efficient installation programme with minimal disruption to golfers. It was clear that one of their key objectives was to undertake all works with as little damage as possible. Their subsequent reinstatement work was of an exceptionally high quality. Even the most critical of members had nothing but praise for the care, professionalism and attention to detail all of their workers demonstrated on the course. Their project was delivered on time, to the demanding quality standards we agreed and within a tight budget. On this basis I would recommend Abbotts to any business.”

MJ Abbott continues to maintain the irrigation system.