Chelsea Football Club, Kingsmeadow Stadium
Construction of SISGrass hybrid turf pitch
The following scope of works was carried out in accordance with the specification produced by PSD:
- Removal and disposal of 3,800m³ of existing pitch profile
- Cut and fill earthworks to create sub base and new pitch levels
- Installation of drainage and irrigation systems
- Import and spread new gravel raft, lower sand and upper rootzone layers, total depth of 450mm
- Preparation and seeding of pitch surface
- Installation of SISGrass hybrid pitch reinforcement system